Crane Trolley Lifting Electric Chain Hoist Block
SHELL:
Light aluminum alloy shall be adopted,which is light but hard and fit for the use in the terrible work environment with a high heat dissipation rate and all tightness design.
INVERSE PHASE SEQUENCE PROTECTING DEVICE:
It is the special eletrical installation which contols the circuit not to work in case of wiring error in the power supply.
LIMIT SWITCH:
The limit switch device is installed where the weight is lifted on and off to make the motor to stop automatically so as to prohibit the chains from exceeding for safety.
24V/36V DEVICE:
It is used to prohibit the emergencies from occurring in case of the leakage in the switch.
SIDE MAGNETIC BRAKING DEVICE:
This device shall rezlize the instant brake in case of the power dump.
CHAIN BAG:
It shall be light,handsome and durable.
CHAIN:
The chain shall adopt the imported FEC G80 ultra heat-treatable aluminum alloy chain.
Model |
Rated load
(Ton) |
Standard Lifting Height
(m) |
Lifting speed
(m/min) |
Chain
falls |
Test load(t) |
Weight(kg) |
SGW-T-00501 |
0.5 |
3.0 |
6.8 |
1 |
0.625 |
89 |
SGW-T-01001 |
1.0 |
3.0 |
6.6 |
1 |
1.25 |
103 |
SGW-T-01002 |
1.0 |
3.0 |
3.4 |
2 |
1.25 |
101 |
SGW-T-01501 |
1.5 |
3.0 |
8.8 |
1 |
1.875 |
157 |
SGW-T-02001 |
2.0 |
3.0 |
6.6 |
1 |
2.5 |
164 |
SGW-T-02002 |
2.0 |
3.0 |
3.3 |
2 |
2.5 |
122 |
SGW-T-02501 |
2.5 |
3.0 |
5.4 |
1 |
3.125 |
177 |
SGW-T-03001 |
3.0 |
3.0 |
5.4 |
1 |
3.75 |
183 |
SGW-T-03002 |
3.0 |
3.0 |
4.4 |
2 |
3.75 |
192 |
SGW-T-03003 |
3.0 |
3.0 |
2.2 |
3 |
3.75 |
146 |
SGW-T-05002 |
5.0 |
3.0 |
2.7 |
2 |
6.25 |
234 |
SGW-T-10004 |
10.0 |
3.0 |
2.7 |
3 |
12.5 |
440 |
FAQ
Q1: Can provide customized products? OEM products or ODM products?
A1: Yes,we can provide customized products according to your requirement. Both OEM and ODM are acceptable.
Q2: Can we print the LOGO on products?
A2: Yes, the OEM is available with the permission of our customers.
Q3: How do you control your quality?
A3: 1. We only select high-quality steel material from famous steel group
2. Standardized production process with traceable ID Card, every part can be tracked to the original records.
3. 100% finished product testing before shipping.
4. We accept third party product inspections.
5. ISO9001 Quality management system certificated factory
6. Supervised container loading process, ensures the last step security
Q4: What's the lead time for production?
A4: Usually around 10-15 days after payment received, around 30 days during new year's or national holidays.
Q5: What Payment terms do you accept?
A5: T/T or L/C, if you want any other method please contact sales.
Q6: What are your advantages compared to the others?
A6: 1.Unique products, with customized service.
2.Timely production and delivery, time is money.
3.Market protection service, long term business strategy.